Data source
Data from European Network of Transmission System Operators for Gas (ENTSOG), delivered clean.
4 datasets pulled from European Network of Transmission System Operators for Gas (ENTSOG)'s releases, checked field by field and shipped the way you want them — daily, weekly, or hourly, your call.
- 4 datasets
- 1 industry
- Real rows on request
What Datadory delivers from European Network of Transmission System Operators for Gas (ENTSOG)
4ENTSOG Transparency Platform
National Gas Transmission Data Portal (UK)
Eurostat Natural Gas Supply Statistics
Global Gas Infrastructure Tracker
Pick a catch, see the rows.
Name any European Network of Transmission System Operators for Gas (ENTSOG) dataset and we send real rows from it — not a screenshot of rows. 1,744 datasets. Pick your catch.
Get a sampleAPI, files, or your warehouse. Daily, weekly, or hourly.
Straight answers about European Network of Transmission System Operators for Gas (ENTSOG) data
What does Datadory deliver from ENTSOG?
One cataloged collection, the ENTSOG Transparency Platform: physical flows, nominations, renominations, allocations and the full capacity family, recorded per interconnection point, storage facility and LNG terminal across roughly 30 European transmission system operators, with a verified 15-field dictionary and sample rows included.
How far back do the gas flow records go?
Captured records reach past October 2007 - some capacity windows open on 1 October 2007 and remain valid indefinitely. Depth varies by point and indicator, so the exact history for your scope is confirmed with real rows when you request a sample rather than promised blanket.
What is a gas day in this dataset?
The industry's trading day for gas: 06:00 to 06:00 Central European time rather than midnight to midnight, with every validity window carrying explicit timezone offsets on both ends. Offsets shift between winter and summer time, which is why deliveries preserve them instead of casting to UTC.
What do the CAM and CMP flags mark?
Records governed by two EU rulebooks: CAM covers capacity-allocation mechanisms - how cross-border capacity is auctioned and booked - while CMP covers congestion-management procedures, including releasing unused capacity back to the market as short-term UIOLI products. The flags let you separate rule-bound market records from plain operational readings.